GN2 SA3 Provisioning System Development Weekly Teleconference

Date

23 Sep 2005

Location

Cyberspace

Type

Weekly Developers Teleconference

Attended By

Name Initials Organisation
Simon Muyal SM RENATER
Francois-Xavier Andreu FX RENATER
Bartosz Belter BB PSNC
Marcin Kaminski MK PSNC
Afrodite Sevasti AS GRNET
Anand Patil AP DANTE
Toby Rodwell TR DANTE
Waldemar Zurowski WZ DANTE

Apologies

Name Initials Organisation
Andreas Polyrakis APO GRNet

Minutes

The meeting started late as people had trouble joining. DANTE joined via PSTN.

Status Update

  • WZ stated that the client module is finished.
  • AP to upload the intradomain interface by the end of today.
  • BB has forgotten to add the error message and addInfo field in the client interface - PSNC will do this asap.
  • BB stated that forwarding layer is complete including integration with pathfinder.

BB: PSNC is having problems installing pathfinder and have sent an email to GRnet about it. There is no response from GRNet yet. BB: There should be an ant task for pathfinder.

DANTE to ask GRnet:

  1. To reply to the mail sent by BB
  2. Provide a jar file.
  3. To send a build.xml for pathfinder deployment

BB: Most of the tasks in the multidomain layer are almost finished.

MK: We need a static class to initialise DB in intradomain system - take this offline with BB/MK. This is already done in MD system in pace.ps.communication package. Use as a servlet so that initialisation is done when axis starts.

BB/MK: Package name refactoring will be done today. DANTE will use the CVS only from next monday to avoid any confusion.

AS joined the teleconference:

  • AS will upload the missing wsdd file to the CVS
  • AS is trying to get the requested changes done
  • AS will get the packaged jar files uploaded
  • AS will get the build.xml uploaded

AS: GRNet will be installing a workstation in 1-2 days at a correct location and they will populate it with the full GRnet topology.

DANTE to look into uploading data from excel into NIS DB.

Renater confirmed that they have access to CVS. They also confirmed that the meeting rooms for next f2f meeting in Paris have been booked.

AP to send MSc student work schema on configuration module to the list.

AS has left the meeting.

Renater to add the test topology by 28 Sep 2005 - next wednesday.

Weekly Meetings

Renater asked for next meeting on 1100 CET. OK with DANTE, PSNC. TR to check with GRNet.

-- AnandPatil - 23 Sep 2005

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r1 | More topic actions



 
GEANT2
Copyright © 2004-2005 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.